Condos & Strata

Special Assessments Explained For BC Condo Buyers

Understand BC strata special levies, unit entitlement, a worked $1.2 million example, payment dates on a sale and the documents condo buyers should review.

Vancouver waterfront towers and boats across Coal Harbour

A Funding Decision, Not A Verdict On The Building

A special levy is a payment collected from strata lot owners for a defined shared expense, separate from monthly strata fees. “Special assessment” is the everyday term many buyers use; special levy is the term used in BC's Strata Property Act. The amount matters, but so do the project, funding history and remaining uncertainty.

A building with a documented roof replacement and a known owner contribution can be easier to evaluate than one with low monthly fees, recurring leaks and no funded repair plan. A levy can represent responsible action. It can also expose years of deferred maintenance. You need the records to distinguish the two.

In Vancouver condos, projects may involve exterior walls and windows, balconies, roofs, elevators, plumbing or parkade membranes. Less visible expenses, such as engineering investigations, legal matters or insurance deductibles, can also create funding pressure. These examples are reasons to investigate, not evidence that a particular building has a problem.

Read the depreciation report beside the budget and recent minutes. A forecast says what may need replacing. The funding decisions show how owners intend to pay for it.

From A Building Concern To An Approved Payment Schedule

For the usual allocation under sections 99, 100 or 195, a special levy requires a three-quarter vote at an annual or special general meeting. A different fair division for that particular levy requires a unanimous vote. The applicable route depends on the allocation and the strata's circumstances; sections and statutory exceptions can matter.

The approved resolution must identify the purpose, total levy, allocation method, each strata lot's amount and due dates. A council discussion about obtaining quotes is not the same as an approved levy. Obtain the actual resolution rather than relying on an informal estimate.

Special levy process
A typical planned project, not a mandatory sequence for every emergency
  1. 1. Identify the issueLeaks, condition reviews or a forecast prompt investigation.
  2. 2. Define the workEngineering and planning clarify what is included.
  3. 3. Estimate and fundBudget, contingency and available reserves are considered.
  4. 4. Obtain approvalThe applicable vote and resolution establish the levy.
  5. 5. Set payment datesOwners receive their amounts and instalment schedule.
  6. 6. Deliver and reportThe work proceeds, with expenditure and project updates.

A repair needed for safety or to prevent significant damage can involve special statutory procedures. Insurance-deductible funding also has an exception to ordinary approval requirements. A buyer should have unusual resolutions or emergency funding reviewed rather than assuming every levy follows the standard meeting route.

Money raised by a levy is restricted to its approved purpose and accounted for separately. Owners should receive expenditure information. If money remains unused, refund provisions apply; a limited exception permits small excess amounts to go into the CRF. Ask about project completion and final accounting as well as the initial approval.

A $1.2 Million Project In A 100-Unit Strata

This is a hypothetical teaching example, not a quotation or a forecast of repair costs. Assume the entire $1,200,000 project is funded by a levy, and the resolution uses unit entitlement. There are 100 strata lots, with a total unit entitlement of 10,000.

The tempting shortcut
$1,200,000 ÷ 100 lots = $12,000 average

The assumed allocation
Lot's entitlement ÷ 10,000 × $1,200,000 = lot's contribution

The average is not necessarily an individual owner's bill. Unit entitlement is the number assigned to a strata lot in the registered schedule. It often reflects habitable area in apartment buildings, but equal or other approved schedules also exist. Do not estimate entitlement from a listing's advertised square footage.

Different hypothetical entitlements, same project
Strata lotCalculationContribution
Lot A: 60 entitlement60 ÷ 10,000 × $1,200,000$7,200
Lot B: 100 entitlement100 ÷ 10,000 × $1,200,000$12,000
Lot C: 150 entitlement150 ÷ 10,000 × $1,200,000$18,000

The other 97 lots would hold the remaining 9,690 entitlement in this example. These three sample lots do not represent the entire allocation. If every lot had equal entitlement and the levy followed that schedule, $12,000 each could be correct. The point is to check, rather than assume.

What If The CRF Funds Part Of The Work?

Now assume owners validly approve using $300,000 from the CRF and raising the remaining $900,000 by levy. Keeping the same entitlement assumptions, Lot A contributes $5,400, Lot B $9,000 and Lot C $13,500. The project has not become cheaper; part is being paid from reserves accumulated through previous contributions.

Then ask what remains in the CRF. Drawing heavily on it for this project may leave other near-term work underfunded. Review the reserve balance after approved expenditures and compare it with upcoming projects.

Approval Date And Payment Date Are Different Questions

Where a levy was approved before a strata lot is conveyed, section 109 distinguishes payments due before conveyance from those due on or after it. The former fall to the owner immediately before conveyance; the latter to the owner immediately after it, as obligations to the strata corporation.

A purchase contract may arrange a different economic outcome between buyer and seller, such as a seller-funded credit or payment of remaining instalments. That arrangement needs clear drafting and completion instructions. It should not be confused with changing the strata corporation's statutory rights. Have your conveyancing lawyer or notary review the dates and contract.

Hypothetical sale with three instalments
  1. November 5, 2026Levy approved. This lot owes $12,000 in three $4,000 instalments.
  2. December 1, 2026First $4,000 due, before conveyance.
  3. January 15, 2027Title conveyed to the purchaser.
  4. February 1 and April 1, 2027Two further $4,000 payments due after conveyance.

Under the statutory split, the pre-conveyance owner owes the first instalment and the post-conveyance owner owes the later two. If the negotiated deal says the seller bears all $12,000, the completion arrangements must address the remaining $8,000. A verbal “seller pays the levy” statement is inadequate.

Cash Timing Can Matter As Much As Total Cost

A $9,000 payment due in one month creates a different liquidity problem from three $3,000 payments spread over several months. Do not assume your mortgage will cover a levy or that the strata will accept a personal payment plan. Confirm funds and deadlines before committing. Late-payment interest and collection consequences can apply; seek advice promptly if an amount is disputed or cannot be paid.

Look At The Explanation Behind The Levy

Context That May Make A Levy Reasonable

  • A report identifies a component nearing the end of its life.
  • The scope, exclusions and cost allowance are documented.
  • Owners have approved a clear funding plan.
  • The reserve strategy considers the next projects too.
  • Progress and final accounting are communicated.

A transparent elevator modernization planned alongside reserve contributions may be a sensible response to an ageing component.

Signals That Deserve More Investigation

  • Several “final” estimates change without explanation.
  • Repeated leaks are patched while investigation is deferred.
  • Payment notices do not match the resolution.
  • Quotes exclude significant related work.
  • Reserves are depleted without a plan for other components.

A smaller levy for an investigation may leave the eventual repair cost unknown. A low initial amount does not cap that risk.

Repeated levies are not proof of poor management. Several major components may mature at similar times, or owners may deliberately choose some levy funding rather than fully pre-fund everything. The useful distinction is between a documented strategy and repeated surprises with weak follow-through.

For example, “windows included” may mean only selected elevations, not every window. “Envelope project complete” may exclude balconies or parkade work. Ask what is outside the contract, whether there is a contingency, and how variations would be funded. A completed project also needs follow-up records, not simply a claim that the building is now problem-free.

What Buyers Should Assemble Before Subject Removal

  • Status: distinguish an approved levy, proposed resolution, preliminary discussion and unsupported rumour.
  • Amount: obtain this lot's share, allocation basis and due dates.
  • Evidence: read AGM/SGM and council minutes, professional reports, scope, quotes and updates.
  • Funding: compare the CRF draw, remaining reserves and depreciation-report forecast.
  • Completion: ask about outstanding instalments, contract allocation and any required credit or holdback arrangements.
  • Uncertainty: identify exclusions, unresolved engineering questions and possible additional work.

The strata-document review guide explains how to connect these records. A current Form B can disclose approved future payments, but a lack of an approved levy does not establish that no major work is being considered.

What Sellers Should Document

Have the resolution, strata lot's assessment notice, payment receipts and current project communications available. Describe the scope accurately and identify outstanding instalments. If a new meeting, estimate or vote changes the position during a sale, raise it promptly with your representative and conveyancer so disclosure and contract arrangements can be reviewed.

Do not describe a levy as fully paid without evidence or describe an investigation as a completed repair. Clear documents let a buyer evaluate the cost in the context of the asking price and future ownership, rather than discovering it late in the transaction.

Questions Buyers Commonly Ask

Does a $1.2 million project in a 100-unit strata mean $12,000 per owner?

No. That is an average. The actual contribution depends on the levy amount, allocation method and this strata lot's entitlement or applicable share. CRF funding can also reduce the amount raised by levy.

Can a buyer owe instalments approved before the purchase?

Yes. For a levy approved before conveyance, section 109 generally assigns payments due on or after conveyance to the post-conveyance owner. Contract arrangements between buyer and seller should be reviewed separately.

Is a paid levy enough to say the building has no remaining risk?

No. Payment answers a funding question. It does not prove the project is complete, all related work is included or other major components are funded.

Should I avoid every building with a levy?

No. Evaluate the work, documentation, funding and remaining uncertainty. A planned, transparent repair can be preferable to deferred work with no credible funding strategy.

Sources And Further Reading

Legal and funding information reviewed October 3, 2026. The worked amounts and dates above are hypothetical.

Considering A Condo With A Current Or Proposed Levy?

If you would like help organizing the building records and assessing the purchase context, contact Spencer. Technical and legal questions can then be directed to the appropriate professional.